company logo company logo

Wilhelmschule
Emsdetten

Renovation and extension of Wilhelmschule in Emsdetten

  • Design:PLAN FORWARD GmbH
  • GFA:New construction: 1,975 m² | renovation: 1,750 m²
  • Services:Property planning, HOAI LPH 1 - 9
  • Completion:2023
  • Client:City of Emsdetten

Project description

In order to meet the increasing numbers of pupils as well as the future pedagogical concept as an all day school, the Wilhelmschule, built in the 70s and extended in 1991 and 2006, is to be adapted to today's standards and extended once again. For this purpose, PLAN FORWARD GmbH was commissioned with the object planning in the phases 1 – 9 according to HOAI.

The preliminary design provides for the demolition of existing areas in the northeast with bathrooms, storage- and janitor-room, covered break area and interior break room. In this area, new space will be created for subject rooms, classrooms, a multi-functional room (auditorium), a second stairwell and bathrooms, as well as the expansion of the administration.

An open three-story air space, which contributes to a clear orientation in the building, characterizes the design. A through-loading elevator provides barrier-free access to the staggered floors. Additionally, the existing buildings will be completely renovated in terms of energy efficiency.

During the construction work, the students and teaching staff will move into the neighboring empty school building. It’s "Back to school" after the summer holidays in 2023.