Expansion of the “Schillerschule" School in Bietigheim-Bissingen
- Design:WOLFF GRUPPE GmbH
- GFA|Gr.Vol:1,952 m² new building | 2,850 m² old building| 8,160 m³ new building
- Services:Architectural design HOAI LPH 1 - 7
- Completion:2016
- Client:City of Bietigheim-Bissingen
Project description
The "Schillerschule" was extended for future use as an all-day school by four classrooms with adjoining group rooms, a cafteria with distribution kitchen and a newly organized administration. The extension designed by the WOLFF GRUPPE-architects presents itself as an independent building and connects to the existing building on three floors.
All floors are accessible barrier-free via a newly installed elevator. The entrance area, auditorium and cafeteria are located on the ground floor with a room layout allowing for flexible use. The cafeteria meets the requirements of the „Versammlungsstättenverordnung“. Distribution and scullery areas including ancillary rooms as well as storage and technical rooms are directly connected to the cafeteria.
WOLFF GRUPPE GmbH merges PLAN FORWARD GmbH, W+P Gesellschaft für Projektrealisierung mbH, and ARIQQA GmbH into a single legal entity under its umbrella, in accordance with Sections 2 and 20 of the German Transformation Act (Umwandlungsgesetz – UmwG). The business activities of the previously independent companies are fully continued within WOLFF GRUPPE GmbH under the business divisions PLANNING, MANAGING and CONSULTING.