EXTENSION OF “KÖRSCHTALSCHULE” IN STUTTGART-PLIENINGEN
- Entwurf:WOLFF GRUPPE GmbH
- GFA|Gr. Vol:2.270 m² | 8.998 m³
- Services:General planning, HOAI LPH 1 - 9
- Completion:2021
- Client:City of Stuttgart
Project description
As general planner, WOLFF GRUPPE realized the new extension building at the "Körschtalschule" in the Plieningen district of Stuttgart. The new building was constructed using the innovative timber modular construction method and expands the classrooms by approximately 1,200 square meters. The project was completed on schedule just in time for school to start in fall of 2021.
The planning envisioned a two-story structure (ground floor, 1st floor) as an independent new building without direct connection to the existing premises and includes required rooms for the all-day elementary school (4 classes) and the community school (2 classes).
The building is accessed via a new, barrier-free entrance from Paracelsusstrasse. The roof is designed as a flat roof and equipped with an extensive green roof and a photovoltaic system.
WOLFF GRUPPE GmbH merges PLAN FORWARD GmbH, W+P Gesellschaft für Projektrealisierung mbH, and ARIQQA GmbH into a single legal entity under its umbrella, in accordance with Sections 2 and 20 of the German Transformation Act (Umwandlungsgesetz – UmwG). The business activities of the previously independent companies are fully continued within WOLFF GRUPPE GmbH under the business divisions PLANNING, MANAGING and CONSULTING.