Extension of the "Realschule" at Broich Schoolcenter in Mülheim an der Ruhr
- Design:PLAN FORWARD GmbH
- GFA:2,775 m²
- Services:Property planning, HOAI LPH 1 - 8
- Completion:2019
- Client:ImmobilienService of the city of Mülheim a. d. Ruhr
Project description
The planned new construction and renovation measures started at the school center in Broich began with the start of the summer break 2018. Over a period of three years, the facade, specialist rooms and fire protection of the Realschule and the Gymnasium are to be renovated and partly renewed.
The first phase of the construction measures, a new extension building to the Realschule with seven specialist rooms and 16 classrooms, was completed in a record time of just seven months and handed over to the city just in time for the start of the new school year in fall 2019.
The short construction time on site was made possible by the chosen combination of solid and modular construction methods. Among other things, the floor slab, stairwells and workshop area were implemented in solid construction. The modules were used for the room cells and the final finishing.
The next building block in the overall project was the construction of an interim building with eight classrooms and additional administrative rooms so that the existing buildings of the school center - the Realschule and the Gymnasium - could be vacated for the renovation work still to be carried out. The new classrooms in the extension building could thus be used during the refurbishment measures and the temporary relocation of school operations to containers reduced.
The proven team of the WOLFF GRUPPE-subsidiaries W+P Gesellschaft für Projektrealisierung mbH and PLAN FORWARD GmbH collaborated successfully to realize the large-scale project.