Interior refurbishment of student housing buildings, Schwerzstrasse in Stuttgart
- Design:PLAN FORWARD GmbH
- GFA:7,262 m²
- Services:Property planning, HOAI LPH 1 -8
- Completion:2023
- Client:Studierendenwerk Tübingen-Hohenheim
Project description
The “Studierendenwerk Tübingen-Hohenheim” has commissioned PLAN FORWARD GmbH with the property planning for the interior renovation of the student housing buildings in Schwerzstrasse 2 and 3. In addition, the long-distance pipelines as well as the heating system in the neighboring building Schwerzstrasse 1 are to be renewed.
The existing buildings in the Hohenheim district of Stuttgart were built in the early 1970s. The facade was renewed in 2007.
The refurbishment will be carried out in two construction phases. The first section of the building will be renovated at the beginning of the summer semester 2022. The other section will remain rented until the renovation of the first section is completed.
As soon as the first construction phase is completed, the students will be moved into the completed areas so that the second section can be renovated. The second construction phase will be completed in time to allow for release of the units at the start of the 2023 winter semester.