company logo company logo

"Schuldorf am
favoritepark"

Extension of the “Schuldorf am Favoritepark" school complex in Ludwigsburg

  • Design:PLAN FORWARD GmbH
  • GFA|Gr.Vol|NIA2,010 m² | 7,171 m³ | 1,735 m²
  • Services:Property planning, HOAI LPH 2 - 8
  • COMPLETION:2024
  • Client:District of Ludwigsburg

Project description

For the extension of the "Schuldorf" at Favoritepark in Ludwigsburg, the district of Ludwigsburg has commissioned PLAN FORWARD GmbH with the planning services of phases 3-7 and the object supervision of service phase 8 according to HOAI 2013 for the implementation of the existing solution and the construction project.

For the Fröbelschule and the Schule am Favoritepark in Ludwigsburg, a two-story new extension building was constructed without direct connection to the existing premises. 

The building project was executed in the innovative and extremely sustainable timber frame construction method and founded on a solid reinforced concrete floor slab with frost aprons. The staircase incl. technical area and basement are also provided in reinforced concrete.

On the ground floor and first floor are the rooms for the school at Favoritepark, with a total of 10 group rooms and interconnected differentiation and inclusion rooms. Further, there is a student kitchen, a library and a teachers' room. 

On the 2nd floor, 2 more group rooms are planned as well as the necessary counseling and administration rooms. These include 1 meeting room, 2 rooms for early counseling, 2 rooms for the school social workers and 2 offices for counseling as well as a theater room.

The ventilation system is also located outside with a privacy screen. In addition, the building provides a partial basement for technology and additionally required storage rooms as well as an elevator connected across all floors. The roof is designed as a flat roof and equipped with an extensive green roof. The entire roof surface is equipped with a PV system. As a measure for sun protection, external venetian blinds are used, as well as increased night ventilation of the individual rooms. 

The project follows the specifications of the state sustainability program NBBW. In addition to the EnEV, the Renewable Energies Heat Act (EEWärmeG) also applies to the extension building.

The project was compelted in the fall of 2024 - just in time for the start of the new school year.